THE STRUCTURE OF A
SHIP
The main part of a
ship is the hull. This is the area between the main deck, the sides - the
starboard side and the port side - and the bottom. It is made up of frames
covered with plating, the keel joints them altogether. The hull is divided up
into a number of watertight compartments by decks and bulkheads.
Bulkheads are
vertical steel walls going across the ship and along side. Decks divide the
hull horizontally. Those dividing up cargo space are known as "tween
decks".
The hull contains the
engine room, cargo space and a number of tanks. In dry cargo ships the cargo
space is divided into holds, in liquid cargo ships it is divided into tanks. At
the fore end of the hull there are the forepeak tanks and at the after end
there are the afterpeak tanks. They are used for fresh water and water ballast.
The space between the holds and the bottom of the hull contains double bottom
tanks. These are used for water ballast and fuel.
All permanent housing
above the main deck is known as superstructure. For a traditional dry cargo
ship main superstructure consisting navigational bridge and a funnel is placed
on the midships, above the main deck. For modern ships the engine room and the
main superstructure are situated at the after end of the ship to leave more
space to load cargo. In tankers, between the engine room and the cargo hold
there is a cofferdam, which protects inflammable cargoes from fire. At the fore
end there is a forecastle, where different mooring and anchoring equipment is
mounted.
І. Read the text and answer the questions.
1. What is the main part of a ship?
2. What is the hull made of?
3. What are bulkheads?
4. What do we call “tweendecks”?
5. What for are tanks used?
6. What is superstructure?
7. Where is the superstructure situated on modern
ships?
8. What for is cofferdam used?
ІІ. Describe the ships using the information given in the table.
1. Ship name: Tundra Princess
|
2. Flying Spindrift
|
DWT: 12714 t
Displacement: 19720 t
GT: 11658
NT: 6290 t
LOA:
Beam:
Draft:
Height:
Speed: 20 knts
|
DWT: 125 t
Displacement: 130 t
GT: 259 t
NT: 77 t
LOA: 30.
Beam:
Draft:
Height:
Speed: 12
knts
|
Немає коментарів:
Дописати коментар